High-precision tunnel lining is manufactured here. The plant is located in Vesyoloye settlement.
Khurmovy Sad shift campfor 1,200 beds with administrative building and canteen.
Railway tunnel — 2475 m, traffic tunnel — 2287 m, service tunnel — 2330 m.
14,7 km
Railway tunnel — 122 m.
22 km
Railway tunnel — 4565 m, traffic tunnel — 3169 m, service tunnel — 4534 m.
23 km
Railway tunnel — 441 m.
36 km
Railway tunnel — 2864 m, traffic tunnel — 1333 m, service tunnel — 2848 m.
39,9 km
Railway tunnel — 433 m.
45 km